Background

Thursday, August 19, 2010

Flooring

Sorry for no updates lately but we have had lots of delays.  We lost about 2 weeks waiting to get the trench dug to run the electric and then getting the electric company to come get us hooked up.  That finally got finished last Tuesday so our flooring was able to get put in after the house cooled down.  We are down to just a few things needing done so hopefully, prayerfully, we will close next week and start moving in.

This is the wood floor.  It is Amendoim engineered flooring  
Here it is in the living room
This is the carpet in the pink rooms.  I don't have a good picture of the rest of the carpet  
They stained the railing.  It is matching to the kitchen cabinets
My brother and Mike hanging ceiling fans.
 

Sunday, August 1, 2010

Outside with trim color

I keep forgetting to upload this picture.  

 

It's August...

and no, unfortunately, we are not in the house yet.  We are very disappointed but we are hoping by the middle of August to be in.  There have been some delays that have mostly been out of our control but, hopefully, they are taken care of and we are moving forward.  Many main things have been done such as sinks/faucets installed, a/c and water pump installed, the tile being laid and the lights being hung.  There are also 2 of the appliances installed.  Hopefully, the next inspection will be done early this week and then the electric run so the a/c can be turned on.  That will allow the laying of the wood floor.  We are in the home stretch!!