There is color now!! This week had some great changes in that all the rooms are painted, the outside is 75% painted (they still have the trim to do) and cabinets were installed. The outside was also graded in prep for concrete and grass. Next week, the plumbing and electrical should be finished up. Not too much longer!
Very pleased with the cabinets and layout of the kitchen! Can't wait to get it organized!!
Can you tell there will be girls living in this house? We had 3 color choices in the budget so we had to be creative. At least there is no pink downstairs :-)
Friday, July 16, 2010
Tuesday, July 6, 2010
Looking like rooms
It is really beginning to look like a house. The drywall began going in 2 weeks ago after the insulation inspection was done. The girls were very excited to see their rooms taking shape. These were taken on 6/30.
Here they are on the staircase.
What a different feeling now that we can't see "through" the stairs.
The kitchen - still having trouble visualizing everything fitting in there
Youngest to oldest, they are all thrilled with their soon to be rooms! Btw, we had been out picking blackberries so that is why they are in long pants in the middle of hot, hot summer!!
The prep for the stucco had also been started. Those very dark clouds dropped some torrential rains right as we left. I don't think they got much more done outside.
We went out tonight on 7/6 to see what had been done while we were out of town. The drywall is done, the stucco started and doors hung with the trim work begun.
The septic field has been built and the well has also been dug.
Subscribe to:
Posts (Atom)